Washington High School
Project Name
City, State
Contact
E-mail
Phone
 
Status
Washington High School
Washington, IA
Jim Tometich
515-280-8022
 
Completed
Client SVPA Architects, Inc.
Contractor Carl A. Nelson & Co.
 
Project
Description

The new 91,030 square feet high school for Washington Community School District contains several different structural systems.

The multiple roof levels are constructed of structural steel framing while precast concrete and steel composite beam framing comprise the floor framing.  Load bearing precast, load bearing masonry, and the structural steel columns provide vertical support.

The design required accommodating a  portion of the new building attaching directly to the existing Junior High Building and a planned future auditorium.

project image
Use your mouse to navigate through the photo gallery index below
thumb image thumb image thumb image thumb image