Des Moines Condo Failure
Project Name
City
Contact
E-mail
Phone
 
Status
Des Moines Condo Failure
Des Moines
Jim Tometich
515-280-8022
 
Completed
Client Brown Engineering
Contractor Hubbell Realty
 
Project
Description

The winter of 2010 damaged numerous commercial and residential properties due to drifting snow, freeze-thaw cycles and wet heavy snows.

The condominium complex had icicles eight feet long and six inches in diameter. Ice damming and improper construction caused water to infiltrate the walls. The moisture caused the formation of mold and damage to the wall board. Complete wall reconstruction was required.

project image
Use your mouse to navigate through the photo gallery index below
thumb image thumb image thumb image thumb image